Building Care, also called Forest B, of Phase 2 of Children's Hospital expansion is underway and the new building is planned to open in Spring of 2022.
The 310,000 square-foot addition will add an eight-story building and will includes diagnostic and treatment facilities, primarily out-patient cancer and others) labs, new state-of-the-art operating rooms, 20 inpatient beds, and a lobby. There will be two floors of underground parking and sterile processing. This will bring SCH bed total to 409, up from 200 before its expansion 2012 plan.
The Hospital posted this information on their Construction Blog about specific construction activity this week:
- Build out interior spaces
- Framing
- Paint
- Install roofing
- Install metal sheeting and panels
- Install mechanical and electrical wiring and plumbing equipment
- Install drywall
- Install siding
- Install elevator equipment
- Install ceilings
- Install irrigation system
- Install gravel maintenance path
- Install flooring
- Building connection work:
- Paint and install ceiling, utility wiring, insulation, and drywall on level 3 of River C
- Install flooring on level 7 of River C
- Demolish concrete walkway and excavate for footings on level 1 of Forest A
- Install expansion joint covers and metal panels on level 9 of Forest A
Call 206-987-8000 or email construction@seattlechildrens.org with questions.