Tuesday, February 18, 2020

Children's Hospital Construction Activity This Week


 













Building Care, also called Forest B, of Phase 2 of Children's Hospital expansion is underway and the new building is planned to open in Spring of 2022. 

The 310,000 square-foot addition will add an eight-story building and will includes diagnostic and treatment facilities, primarily out-patient cancer and others) labs, new state-of-the-art operating rooms, 20 inpatient beds, and a lobby. There will be two floors of underground parking and sterile processing. This will bring SCH bed total to 409, up from 200 before its expansion 2012 plan. 

The helicopter landing pad moved temporarily to the roof of Forest A (176’), now known as Friends of Costco Building, Phase 1 of the expansion. The landing pad will be active until Building Care is completed. Noise is expected to be louder than the former ground-based helipad. When Forest B is complete, the helistop will moves to its permanent location on top of the Friends of Costco Building (same height). 

Lights were added, recently, to the horizontal swing arm (boom) portion of the tower crane to increase safety for helicopter landings. These are in addition to the lights at the end of the boom and on the crane operator’s cab. The additional lights will help the helicopter pilots in identifying the location of the boom when landing or departing the helipad in the dark. While the lights are visible from the ground, they are not bright enough to interfere with any neighboring properties. As a reminder, the tower crane is scheduled to remain onsite through August 2020.

The Hospital posted this information on their Construction Blog about specific construction activity this week: 
    • Erect structural and support steel
    • Install decking
    • Pour concrete for walls, curbs, slabs, stairs and duct bank
    • Install fireproofing
    • Install mechanical, electrical and plumbing equipment
    • Paint concrete
    • Build exterior panels
    • Set stairs
    • Set elevator machines
    • Frame walls and doors
    • Install sprinkler system
    • Build concrete block walls
    • Set air handling units
    • Install rain leaders
    • Install natural gas line (see Feb. 7 Construction Blog post for details)
    • Internal activities in River building: install pipes for pneumatic tube system extension


Call 206-987-8000 or email construction@seattlechildrens.org with questions.

No comments: