Children's Hospital has begun construction activity in preparation for the new Building Care, Forest B, Phase 2 of the expansion, planned to open in Spring of 2022.
The 310,000 square-foot addition will add an eight-story building and will includes diagnostic and treatment facilities, primarily out-patient cancer and others) labs, new state-of-the-art operating rooms, 20 inpatient beds, and a lobby. There will be two floors of underground parking and sterile processing. This will bring SCH bed total to 409, up from 200 before its expansion 2012 plan.
The helicopter landing pad has already moved temporarily to the roof of Forest A (176’), now known as Friends of Costco Building, Phase 1 of the expansion. The landing pad will be active for the next four years, until Building Care is completed Noise is expected to be louder than the former ground-based helipad. When Forest B is complete, the helistop will moves to its permanent location on top of the Friends of Costco Building (same height).
The Hospital posted this information on their Construction Blog about specific construction activity this week:
- Install rebar and pour concrete for curbs, walls, footings, columns, and pads/slabs
- Remove deck and scaffold; demolish scaffold brackets
- Excavation
- Erect steel backup structure for exterior mock-up and install framing and sheeting
- Install underground plumbing and electrical
- Activities south of Forest A (near the loading dock and NE 45th Street): install cable rail; excavation; install “lagging” to prevent cave-ins during earthwork
- Internal activity on L1 of Forest A (Friends of Costco Building): penetrations for firestops; install communication pathways
- Internal activity in Emergency Department: paint and clean wall; remove infection prevention barrier
Construction noise will be generated throughout the week. The noisiest external activities will be the concrete work, which will occur all week. The noisiest internal work will be the firestop penetrations and installing communication pathways. Expect heavy truck traffic, primarily from concrete trucks. Construction activity is weather-dependent and subject to change based on conditions.
- Construction activity is weather-dependent and subject to change based on conditions. All work will take place within standard construction hours: 8-6pm and 9-6pm on Saturday.
- Call 206-987-8000 or email construction@seattlechildrens.org with questions
No comments:
Post a Comment