Children's Hospital is doing soil testing today according to their Construction Blog, which will result in noise and vibration. The blog says:
A crew will test bore four holes at the intersection of 40th Ave. NE and Sand Point Way on Monday Feb. 21 from 8 a.m. to 4:30 p.m. This will cause some noise and vibration.
There will be a service truck and trailer parked along the NW side of 40th Ave NE near the intersection at Sand Point Way close to the drilling operation.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment